Tohma Bridge

  • Location : Malatya

  • Type : Steel Bridge

  • Client: Ziver Holding

  • Service Provided: Supervision and Consulting

  • Summary of Project:

    The steel bridge having 518 meters length with 68-meter spans to be constructed by the incremental launching method has been checked and the necessary details for the construction have been studied, alternative construction methods have been proposed and retrofits have been proposed against the vulnerable parts of the design.