We are happy to be part of steel girder bridge construction of Zarova Bridge erected by Pyes using launching girder method.
The 71 m long steel girders are 360 Ton each.
Bridgewiz International Engineering and Consulting will be attend the International Bridge Conference® Workshop with presentation
Topic is Machine-Learning Based Mobile App for Determining Corrosion today.
𝐓𝐡𝐞 𝐓𝐨𝐡𝐦𝐚 𝐁𝐫𝐢𝐝𝐠𝐞
As Bridgewiz, we have provided consultancy services on the application of the incremental launch method.
Artificial intelligence and machine learning are used to determine the tree diameter value. It is worked with the YOLO Algorithm, one of the best in its field.
Tests of wireless load cell equipped steel wheels for the incremental launching method.
Please watch our new Youtube Video: Machine-Learning Based Mobile App for Determining Corrosion Presence Using Image
Ready for Launching!
A very special launching nose with hydraulic jacks has been designed and shipped to the construction site. The 48 meter-long launching nose is one of the longest ones in the world. The hydraulic jacks will be used to lift the tip of the cantilever onto the pier top.
Our software developers have started advancing in artificial intelligence to detect alkali-silica reaction on concrete bridges. Our android application will be ready for ease of use in the near future.