Related Posts
We are happy to be part of steel girder bridge construction of Zarova Bridge erected by Pyes using launching girder method.
The 71 m long steel girders are 360 Ton each.
𝐓𝐡𝐞 𝐓𝐨𝐡𝐦𝐚 𝐁𝐫𝐢𝐝𝐠𝐞
As Bridgewiz, we have provided consultancy services on the application of the incremental launch method.
Ready for Launching!
A very special launching nose with hydraulic jacks has been designed and shipped to the construction site. The 48 meter-long launching nose is one of the longest ones in the world. The hydraulic jacks will be used to lift the tip of the cantilever onto the pier top.
We are pleased to share with you the 24-meter launching nose model prepared for the Bitlis Çayı Viaduct project that we are the consultant.
Tests of wireless load cell equipped steel wheels for the incremental launching method.
Bridgewiz International Engineering and Consulting will be attend the International Bridge Conference® Workshop with presentation
Topic is Machine-Learning Based Mobile App for Determining Corrosion today.
Bridgewiz International Engineering and Consulting: Trusted Source of Fast and Professional Answers for Bridge Engineering
Please follow us on Linkedin and Youtube.
Please watch our new Youtube Video: Machine-Learning Based Mobile App for Determining Corrosion Presence Using Image