Related Posts
𝐓𝐡𝐞 𝐓𝐨𝐡𝐦𝐚 𝐁𝐫𝐢𝐝𝐠𝐞
As Bridgewiz, we have provided consultancy services on the application of the incremental launch method.
We are happy to be part of steel girder bridge construction of Zarova Bridge erected by Pyes using launching girder method.
The 71 m long steel girders are 360 Ton each.
Ready for Launching!
A very special launching nose with hydraulic jacks has been designed and shipped to the construction site. The 48 meter-long launching nose is one of the longest ones in the world. The hydraulic jacks will be used to lift the tip of the cantilever onto the pier top.
We are pleased to share with you the 24-meter launching nose model prepared for the Bitlis Çayı Viaduct project that we are the consultant.
Bridgewiz International Engineering and Consulting: Trusted Source of Fast and Professional Answers for Bridge Engineering
Please follow us on Linkedin and Youtube.
Tests of wireless load cell equipped steel wheels for the incremental launching method.
Please watch our new Youtube Video: Machine-Learning Based Mobile App for Determining Corrosion Presence Using Image