Bridgewiz International Engineering and Consulting will be attend the International Bridge Conference® Workshop with presentation
Topic is Machine-Learning Based Mobile App for Determining Corrosion today.
Ready for Launching!
A very special launching nose with hydraulic jacks has been designed and shipped to the construction site. The 48 meter-long launching nose is one of the longest ones in the world. The hydraulic jacks will be used to lift the tip of the cantilever onto the pier top.